Production-Summary

Summary:

  • On a consolidated basis, Hudbay’s copper production exceeded 2017 guidance and production of zinc and precious metals were within 2017 guidance ranges.
  • Production results were achieved with strong safety performance, including zero lost time accidents at the Constancia mine in 2017.

Contained Metal in Concentrate1

2018 Guidance

2017 Production

2017 Guidance

Manitoba2

 

 

 

 

Copper

(tonnes)

27,500 - 32,500

37,411

32,500 – 42,500

Zinc

(tonnes)

105,000 - 130,000

135,156

125,000 – 150,000

Precious Metals3

(ounces)

120,000 - 145,000

106,918

90,000 – 110,000

 

 

 

 

 

Peru

 

 

 

Copper

(tonnes)

95,000 - 115,000

121,781

100,000 – 115,000

Precious Metals3

(ounces)

65,000 - 85,000

51,493

55,000 – 65,000

 

 

 

 

 

Total

 

 

 

 

Copper

(tonnes)

122,500 - 147,500

159,192

132,500 – 157,500

Zinc

(tonnes)

105,000 - 130,000

135,156

125,000 – 150,000

Precious Metals3

(ounces)

185,000 - 230,000

158,411

145,000 – 175,000



 

 

 

 

 

 

 

 

 

1 Metal reported in concentrate is prior to refining losses or deductions associated with smelter terms. 
2 Includes 100% of Reed mine production; Hudbay owns a 70% interest in the Reed mine.
3 Precious metals production includes gold and silver production on a gold-equivalent basis. Silver converted to gold at a ratio of 70:1. 

                   
For more information, please see our 2018 Guidance.

Recently Added

Sort by:

TSE: HBM $ 6.18 +0.08 +1.31% Volume: 273,987 October 15, 2018
NYSE: HBM $ 4.76 +0.09 +1.93% Volume: 102,489 As of 10:43 AM 10/15/2018